• Total LOM: 213kt @ 2.8g/t Au for 19.1koz contained
  • In MarQ’26, Fish underground mine transitioned from “mine readiness” to care & maintenance in line with the DFS 2.0 mine plan, with mining operations ceasing and the mine positioned to be ready for the recommencement of ore production in early CY27
  • Fish will provide a high grade underground feed to Brightstar’s Laverton processing plant upon commissioning in June CY27
  • Fish will be utilising existing underground equipment, infrastructure and personnel from Brightstar’s established underground operations
  • Resource is open at depth with significant upside opportunity from deeper drilling and life-of-mine extensions for a potential ‘Stage 2’ at depth