- JORC Mineral Resource of 3.1Mt @ 2.1g/t Au for 206koz Au (inclusive of lower grade halo)
- Mining to commence SepQ’27, with a 2 year mine life based on current underground mining plan
- Ore Reserves: 0.5Mt @ 2.7g/t Au for 47koz
- Historical underground production: 270koz @ 16g/t Au
- Utilising existing underground equipment, infrastructure and personnel from Brightstar’s established underground operations
